Call Us: 877-665-5666

Horner’s Canvas Collection of OCS controllers is just as the name implies – a new canvas for users to utilize a brand new set of enhanced graphics objects in Cscape 10 to give full creative freedom to create screens as technically advanced or as visually stunning as they desire. Take advantage of single touch swipe gestures and a redesigned system menu to build your application for the modern world. The Canvas Series also supports WebMI+ as the next iteration of one of the best remote access tools for your OCS controllers, and also offers MQTT, numerous CAN protocols and Enhanced IEC programming support right out of the box.

  • Please login to see price/buy item.
    All Canvas 7D units feature a built-in logic engine, operator interface, networking and I/O. Please select the model number from the dropdown to see current stock and pricing. Current lead time is 2 - 6 weeks.

                         
  • Please login to see price/buy item.
    The Canvas 4 sets the standard for functionality and performance. All units feature a built-in logic engine, operator interface, networking and I/O. Please select the model number from the dropdown to see current stock and pricing. Current lead time is 2 - 6 weeks.  

       
  • Please login to see price/buy item.
    All units feature a built-in logic engine, operator interface, networking and I/O. Please select the model number from the dropdown to see current stock and pricing. Current lead time is 2 - 6 weeks.

                       
  • Please login to see price/buy item.
    All Canvas 10D units feature a built-in logic engine, operator interface, networking and I/O. Please select the model number from the dropdown to see current stock and pricing. Current lead time is 2 - 6 weeks.

                     
  • Please login to see price/buy item.
    Canvas 5 Controller 4.3", 4 DC In, 4 DC Out, 4 Analog In (mA/V)

    The Canvas 5 is one of the new additions to the Canvas Collection of embedded I/O controllers. All units feature a built-in logic engine, operator interface, networking and I/O.

    Current lead time is 2 - 6 weeks.

     
Go to Top